Krups XP7200 Series Servicing Manual Download Page 4

 
Coffee nozzle 
Unclip the coffee pipe. 
Remove the nozzle clip by means of a rule or a screwdriver placed between the clip and the 
facing mount:  
 
 
 
 

Clip 

 
 
 
 
 
 

 

 

 
 
Technical mount: (provides access to the distributor and thermoblock/actuator sub-assembly) 
 
Unclip and remove the coffee inlet pipe and disconnect the hose on the tamping head. 
Remove the window. 
Remove the mounting screws from the technical mount. 
Disconnect the connectors and the electronic circuit wires and take the wires out of the grommets. 
Remove the technical mount with the grinder in place (the wires connected to the actuator switches 
pass through the shroud opening). 
 

Thermoblock / NTC / soldered lugs sub-assembly 
There is no provision for dismantling this sub-assembly. 
The only parts which may be replaced are: 

  Tamping head parts (creamy seal, O-ring, coffee grid…) 

 The 

ejection 

scraper 

  The actuator switch control plate with its spring and 3 switches 

  The interface and its seal 

  The ejector rod "Barista" seal 

Remove the 3 thermoblock/actuator sub-assembly mounting screws in the base. 
Disconnect the distributor/thermoblock coffee hose from the distributor 
Disconnect the thermoblock/distributor steam hose from the thermoblock system (if necessary 
remove the drain from the distributor after disconnecting the coffee drain hose from the 
distributor). 
Disconnect the steam nozzle hose. 
 
Thermoblock system and ejection scraper Interface 
Remove the ejection scraper (this may be a little difficult as the screwdriver is not in line with 
the screw). 
 
Distributor 
Remove the 2 distributor mounting screws in the base (Phillips-head indentation). 
Disconnect the distributor/thermoblock steam hose from the thermoblock (remove the drain 
from the distributor, if necessary after disconnecting the coffee drain hose from the distributor). 
Remove the 3 thermoblock/actuator sub-assembly mounting screws in the base and tilt the 
unit so as to have access to the hoses connected to the distributor. 
Access to the distributor may be facilitated by removing the facing panel (2 4 clips) 
and the facing mount (2 screws in the lower part). 
 
Ejection rod "Barista" seal
Remove the tamping head 
Unscrew the thermoblock/actuator from the bottom of the  
coffee-maker and lift it up 
Raise the ejector and remove the plunger head. 
Remove the "Barista" seal. 

 

4

Summary of Contents for XP7200 Series

Page 1: ...2 electronic boards for o thermoblock temperature regulation o mesuring the waterflow volume by counting flowmeter pulses o 1 cup 2 cup hot water graphic model steam cleaning and scale removal cycle...

Page 2: ...cing Facing mount mount Grinder Tamping head Control board if necessary replace board Power board Pump Flowmeter Thermoblock actuator Fuses Distributor Steam nozzle Coffee nozzle Body provides visual...

Page 3: ...by pressing on the top nut using a socket spanner or equivalent Disassemble the switch control plate Flowmeter No particular instructions Power electronic board Electronic circuit mount maintained in...

Page 4: ...onnect the distributor thermoblock coffee hose from the distributor Disconnect the thermoblock distributor steam hose from the thermoblock system if necessary remove the drain from the distributor aft...

Page 5: ...be replaced Use Norma Cobra 7 5 clamps Lock the clamps with gripping pliers and check that they have been properly assembled Grinder Indexing and mounting of the grinder ring on the coffee maker are t...

Page 6: ...embly line same as for V16 except that setting operation is carried out before the standard coffee cycle With cake tray draw and tank removed Press steam key mains connection o Blue On Off light comes...

Page 7: ...lay 1 2 3 4 5 Time for strong coffee grinding secs 6 7 8 9 10 grinder 2 15 02 2006 Lead Respect the earthwire routing The lead earthwire must not be in contact with moving parts stainless steel corner...

Page 8: ...When screwing be careful not to offset the tamping head mount Thermoblock and ejection scraper interface Take care when replacing the seal which must not protrude into the coffee chamber Distributor R...

Page 9: ...ghten counterclockwise Electronic boards Connectors on electronic boards check that connectors are well secured by the clips Check the coffee volume selector button for correct indexation 1 2 turn pos...

Page 10: ...see troubleshooting diagnosis table grinder not compliant quantity of ground coffee electronics setting not compliant with the grinder ejection ram stuck in high position cake tray replaced partially...

Page 11: ...maximum time for the ground coffee distributor has been reached without the ground coffee proportioning switch being detected Concerns the ground coffee version 3 3 Cycle start conditions The distrib...

Page 12: ...tank or with tank empty Water level board or bundle defective 8 8 Hot water and Coffee Pump After a certain time of pump control during coffee or water flow the circuit is considered to be blocked as...

Page 13: ...use which led to the coffee leaking Interface tank seal Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective Thermoblock coffee circuit clogged up by...

Page 14: ...circuit Volume of coffee in the cup does not comply Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective A few drops of water drip from the steam noz...

Page 15: ...ad and grinder spout Insert power board with drain time extended from 8 to 10 secs V21 picto and V14 graphic Bad thermoblock drain Leakage at tamping head seal level Check that the tamping head does n...

Page 16: ...consumption of distributor motor distributor opposing torque too high Risk of damage to the electronic power board AFTER SALES A S MODE OPERATION 1st level A S mode This mode makes it possible to acc...

Page 17: ...Times switched on number unit 13 Operating time min ON OFF light on 14 Rinsing number unit 15 Auto cut off duration 1 2 3 4 5 hours hour 16 Water hardness scale removal frequency level 0 1 2 3 4 valu...

Page 18: ...r No 13 Production date 14 First use date 15 Graphic software version Ref 16 Power software version Ref 17 Model grinder Model 18 Coffee function water volume ml 19 Steam function water volume ml 20 T...

Page 19: ...19...

Page 20: ...correct operation of switches for detecting the presence of draw cake tray and tank Correct coffee operation with measurement of cake thickness comprised between 11 and 13 mm with new grinder in 60 m...

Reviews: