Krups XP7200 Series Servicing Manual Download Page 16

If the customer is 
demanding, change the 
visu board. 

Impossible to set the 
date after 
unplugging or cut-off 
in current 

Fault in the facing visu electronic 
board 

Validate the date when the 
filter was first fitted. 
Consequence: there will no 
longer be any warning 
message to replace the filter 

Î

 use the index on the top of 

the filter to memorise the date 
when the filter was first used

 

Visu boards concerned by 
the bug: versions V6.8, 
V6.9, V7.0 and V7.2 

Display returns to 
intial date when filter 
fitted 

Blue light 0/1 
flashes rapidly 

Drop in low voltage supply 
through excessive 
consumption 

Check consumption of 
distributor motor (distributor 
opposing torque too high) 

Risk of damage to the 
electronic power board 

 
 
 
 
 

AFTER-SALES (A-S) MODE OPERATION 

 

1st-level A-S mode

  

This mode makes it possible to access information on the rate of use of different coffee-maker 
functions. 
 
Pictographic model 
Access to A-S 1 via combination of the following keys: 

S Strong Coffee key + Mains 

Connection. 

 

  The Strong Coffee key enables functions to scroll and the Coffee key to return. No signalling. 

  Access counter values of the different functions via the Steam key and return via the same 

Steam key. Signalling via the Calc light. 

  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Function 1 

Steam 

Counter value

Calc 

Steam 

Strong coffee 

Coffee 

Function 2 

Strong coffee 

Coffee 

Function N 

Steam 

Counter value

Calc 

Steam 

Steam 

Counter value

Calc 

Steam 

 

16

Summary of Contents for XP7200 Series

Page 1: ...2 electronic boards for o thermoblock temperature regulation o mesuring the waterflow volume by counting flowmeter pulses o 1 cup 2 cup hot water graphic model steam cleaning and scale removal cycle...

Page 2: ...cing Facing mount mount Grinder Tamping head Control board if necessary replace board Power board Pump Flowmeter Thermoblock actuator Fuses Distributor Steam nozzle Coffee nozzle Body provides visual...

Page 3: ...by pressing on the top nut using a socket spanner or equivalent Disassemble the switch control plate Flowmeter No particular instructions Power electronic board Electronic circuit mount maintained in...

Page 4: ...onnect the distributor thermoblock coffee hose from the distributor Disconnect the thermoblock distributor steam hose from the thermoblock system if necessary remove the drain from the distributor aft...

Page 5: ...be replaced Use Norma Cobra 7 5 clamps Lock the clamps with gripping pliers and check that they have been properly assembled Grinder Indexing and mounting of the grinder ring on the coffee maker are t...

Page 6: ...embly line same as for V16 except that setting operation is carried out before the standard coffee cycle With cake tray draw and tank removed Press steam key mains connection o Blue On Off light comes...

Page 7: ...lay 1 2 3 4 5 Time for strong coffee grinding secs 6 7 8 9 10 grinder 2 15 02 2006 Lead Respect the earthwire routing The lead earthwire must not be in contact with moving parts stainless steel corner...

Page 8: ...When screwing be careful not to offset the tamping head mount Thermoblock and ejection scraper interface Take care when replacing the seal which must not protrude into the coffee chamber Distributor R...

Page 9: ...ghten counterclockwise Electronic boards Connectors on electronic boards check that connectors are well secured by the clips Check the coffee volume selector button for correct indexation 1 2 turn pos...

Page 10: ...see troubleshooting diagnosis table grinder not compliant quantity of ground coffee electronics setting not compliant with the grinder ejection ram stuck in high position cake tray replaced partially...

Page 11: ...maximum time for the ground coffee distributor has been reached without the ground coffee proportioning switch being detected Concerns the ground coffee version 3 3 Cycle start conditions The distrib...

Page 12: ...tank or with tank empty Water level board or bundle defective 8 8 Hot water and Coffee Pump After a certain time of pump control during coffee or water flow the circuit is considered to be blocked as...

Page 13: ...use which led to the coffee leaking Interface tank seal Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective Thermoblock coffee circuit clogged up by...

Page 14: ...circuit Volume of coffee in the cup does not comply Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective A few drops of water drip from the steam noz...

Page 15: ...ad and grinder spout Insert power board with drain time extended from 8 to 10 secs V21 picto and V14 graphic Bad thermoblock drain Leakage at tamping head seal level Check that the tamping head does n...

Page 16: ...consumption of distributor motor distributor opposing torque too high Risk of damage to the electronic power board AFTER SALES A S MODE OPERATION 1st level A S mode This mode makes it possible to acc...

Page 17: ...Times switched on number unit 13 Operating time min ON OFF light on 14 Rinsing number unit 15 Auto cut off duration 1 2 3 4 5 hours hour 16 Water hardness scale removal frequency level 0 1 2 3 4 valu...

Page 18: ...r No 13 Production date 14 First use date 15 Graphic software version Ref 16 Power software version Ref 17 Model grinder Model 18 Coffee function water volume ml 19 Steam function water volume ml 20 T...

Page 19: ...19...

Page 20: ...correct operation of switches for detecting the presence of draw cake tray and tank Correct coffee operation with measurement of cake thickness comprised between 11 and 13 mm with new grinder in 60 m...

Reviews: