Vent Line
Chase
Electrical
Chase
Beer Chase
Soda Chase
Water Line
Chase
Plumbing
Chase
Krowne Metal Corporation
• 100 Haul Rd. Wayne, NJ 07470
P: (800) 631-0442 • F: (973) 872-1129
krowne.com
5
Modular Bar Die Installation
Instructions
Once all units are fully leveled, tighten all bolts and nuts. Next,
attach the modular bar die to the ground through pre-cut 1/4”
holes on the bottom of the die wall. Your contractor will pick the
best installation method for your application.
Free standing equipment such as bottle coolers, mug frosters,
back bar, and glass washers can be placed into their
designated sections according to the floor plan. Bottle coolers
and mug frosters should be installed with a 2” gap on the
left side for proper ventilation. Krowne includes this 2” gap in
layout drawings.
We recommend using NSF approved silicone to seal all joints
near the floor. Tile can be abutted to the front floor panels and
then sealed.
All plumbing, electric, beer, soda & vent lines should be
installed by a licensed professional to maintain factory
warranty. Refer to diagram below for proper placement of all
lines.
ANCHORING
FREE STANDING UNITS
SEALING
UTILITY LINES
5
7
8
6
INSTALLATION (CON’T)