background image

Vent Line  

Chase
Electrical 

Chase
Beer Chase
Soda Chase

Water Line 

Chase

Plumbing 

Chase

Krowne Metal Corporation 

•  100 Haul Rd. Wayne, NJ 07470

P: (800) 631-0442 • F: (973) 872-1129

[email protected] 

krowne.com  

5

Modular Bar Die Installation

Instructions

Once all units are fully leveled, tighten all bolts and nuts. Next,  

attach the modular bar die to the ground through pre-cut 1/4” 

holes on the bottom of the die wall. Your contractor will pick the 

best installation method for your application. 

Free standing equipment such as bottle coolers, mug frosters, 

back bar, and glass washers can be placed into their  

designated sections according to the floor plan.  Bottle coolers 

and mug frosters should be installed with a 2” gap on the 

left side for proper ventilation. Krowne includes this 2” gap in 

layout drawings.

We recommend using NSF approved silicone to seal all joints 

near the floor. Tile can be abutted to the front floor panels and 

then sealed. 

All plumbing, electric, beer, soda & vent lines should be  

installed by a licensed professional to maintain factory  

warranty. Refer to diagram below for proper placement of all 

lines.

ANCHORING

FREE STANDING UNITS

SEALING

UTILITY LINES

5

7

8

6

INSTALLATION (CON’T)

Reviews: