Getting Started
13
S-1200/ 1200U
UNPACKING AND PLACEMENT
The S-1200/ 1200U is a precision instrument and should be handled with the utmost care when deciding
where it is to be placed and while it is being unpacked and finally installed. Makes sure the installation location
is dry and level, and able to provide adequate ventilation. The S-1200/ 1200U runs warm to the touch and
requires the bottom and top of the unit be free from obstruction with good circulation of air. Allow a minimum
of 3 inches above the unit for proper ventilation. Additional ventilation may be required when the unit
occupies the same space with other electronics that generate heat like power amplifiers. Please consult an
authorized KRELL dealer or KRELL industries to insure proper installation guidelines.
1. Accessories included
A.
1 AC Power cord
B.
1 Handheld Remote control
C.
1 Trigger cable
D.
1 CD w/ Owner’s reference
E.
1 Quick start guide
F.
1 Warranty registration card
G.
2 AAA Batteries
H.
1 T-10 torx wrench
AC Power Guidelines
The S-1200/ 1200U is designed to work all over the world. The operating voltage is determined at the factory
and is specifically set to operate in the country of final destination. The S-1200/ 1200U requires good clean
power and doesn’t require additional filtration. Make sure the AC line voltage is within plus or minus 10% of
the specified AC line voltage setting for proper operation.
NOTE:
The S-1200/ 1200U may not operate correctly when AC regeneration or voltage conversion devices are
utilized.