Vent Installation
SECTION 7
VENTING
#SFD-36
R.6 February 2022
33
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
7.5 Vent Installation
7.5.1 5” x 8” Venting
IMPORTANT: The vertical vent heat shield must be installed for all
venting installations. Refer to Section
IMPORTANT: Horizontal vent sections require ¼” (6mm) rise for every
12” (305mm) of travel.
7.5.1.1 5” x 8” Vertical Terminations
(i)
Minimum / Maximum Vertical Terminations:
3’ (914mm) minimum vertical length / 50’ (15.24m) maximum
vertical termination cap
i
A
B
DIAG. 1
5” x 8” NATURAL GAS AND PROPANE VERTICAL TERMINATIONS
(A)
Vertical Vent Heat Shield
(B)
Termination Cap