
Precautions for use
1. Precautions for mounting and piping
A. When installing, make sure no foreign matter such as dust gets into the equipment and piping.
It may cause malfunction or failure.
In addition, do not drop it, as dropping it may distort or damage internal parts and cause
malfunction.
B. Grease filling and grease flushing
Be careful when constructing, as dust and air can cause malfunction.
a)
Piping behind distribution valve (from the distribution valve to the grease point)
Fill the piping from the distribution valve to the bearing (greasing point) with grease before
installing the piping.
When filling the grease, be careful not to let dust or air enter the piping.
b)
Piping from pump to distribution valve
The piping between the pump and the distribution valve should be filled with grease after the
piping is installed.
Please be careful not to put dust or air in the same way as well as “a)”.
c)
At the time of filling, pay attention to the remaining amount of grease in the tank, pail, drum,
etc., which is the supply source, and do not enter air.
d)
After filling, run the grease for a while and check the condition of dust, air, etc., and make
sure that the grease is clean.
Please note that dust and grit that has entered the piping will not come out immediately.
2. Before the test run
Confirm that the piping installation and grease flushing are completed.
Check for loose fittings of the piping.
3. Other
Please read the instruction manual carefully and use the product correctly.