7. Vacuum Drying and Leakage Checking
86
Installation
7.
Vacuum Drying and Leakage Checking
7.1 Purpose of vacuum drying
Eliminating moisture in system to prevent the phenomena of ice-blockage and copper oxidation.
Ice-blockage shall cause abnormal operation of system, while copper oxide shall damage compressor.
Eliminating the non-condensable gas (air) in system to prevent the components oxidizing, pressure
fluctuation and bad heat exchange during the operation of system.
7.2 Selection of vacuum pump
The ultimate vacuum degree of vacuum pump shall be -756mmHg or above.
Precision of vacuum pump shall reach 0.02mmHg or above.
7.3 Operation procedure for vacuum drying
Due to different construction environment, two kinds of vacuum drying ways could be chosen, namely
ordinary vacuum drying and special vacuum drying.
7.3.1 Ordinary vacuum drying
1. When conduct first vacuum drying, connect pressure gauge to the infusing mouth of gas pipe and liquid
pipe, and keep vacuum pump running for 1hour (vacuum degree of vacuum pump shall be reached
-755mmHg).
2 If the vacuum degree of vacuum pump could not reach -755mmHg after 1 hour of drying, it indicates
that there is moisture or leakage in pipeline system and need to go on with drying for half an hour.
3 If the vacuum degree of vacuum pump still could not reach -755mmHg after 1.5 hours of drying, check
whether there is leakage source.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
7.3.2 Special vacuum drying
The special vacuum drying method shall be adopted when:
1. Finding moisture during flushing refrigerant pipe.
2. Conducting construction on rainy day, because rain water might penetrated into pipeline.
3. Construction period is long, and rain water might penetrated into pipeline.
4. Rain water might penetrate into pipeline during construction.
Procedures of special vacuum drying are as follows:
1. Vacuum drying for 1 hour.
2. Vacuum damage, filling nitrogen to reach 0.5Kgf/cm2 .
Because nitrogen is dry gas, vacuum damage could achieve the effect of vacuum drying, but this
method could not achieve drying thoroughly when there is too much moisture. Therefore, special
attention shall be drawn to prevent the entering of water and the formation of condensate water.
3. Vacuum drying again for half an hour.
If the pressure reached -755mmHg, start to pressure leakage test. If it cannot reached the value,
repeat vacuum damage and vacuum drying again for 1 hour.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
Summary of Contents for KV24 ODU-ARF21C
Page 1: ......
Page 6: ...Nomenclature 4 General Information 3 Nomenclature 3 1 Indoor Outdoor Unit...
Page 11: ...Features Indoor Units 9 Alarm lamp Long distance on off controller...
Page 13: ...Service Space Indoor Units 11 3 Service Space 1000mm 1000mm 1000mm 1000m m...
Page 19: ...Field Wiring Indoor Units 17 9 Field Wiring 24K 36K...
Page 20: ...Field Wiring 18 Indoor Units 48K 60K...
Page 34: ...Field Wiring 32 Indoor Units 10 Field Wiring 24K 36K...
Page 35: ...Field Wiring Indoor Units 33 48K 60K...
Page 39: ...Service Space Indoor Units 37 3 Service Space...
Page 44: ...Ceiling Floor Type 42 Ceiling Floor Type 9 Field Wiring 24K 36K...
Page 45: ...Ceiling Floor Type Ceiling Floor Type 43 48K 60K...
Page 49: ...Service Space Floor standing Type 47 3 Service Space...
Page 50: ...Wiring Diagrams 48 Floor standing Type 4 Wiring Diagrams KV36FM ARF21C KV60FM ARF21C...
Page 55: ...Field Wiring Floor standing Type 53 9 Field Wiring 36K...
Page 56: ...Field Wiring 54 Floor standing Type 60K...
Page 59: ...Dimensions Outdoor Units 57 Model KBtu h Unit mm W D H W1 A B 48 60 952 415 1333 1045 634 404...
Page 62: ...Wiring Diagrams 60 Outdoor Units 4 Wiring Diagrams KV24ODU ARF21C KV36ODU ARF21C...
Page 63: ...Wiring Diagrams Outdoor Units 61 KV48ODU ARF21C KV60ODU CRF21C...
Page 103: ...Troubleshooting Electrical Control System 101 2 1 5 Display board of floor standing...
Page 113: ...Troubleshooting Electrical Control System 111 2 4 4 2 E1 malfunction For 485 communication E1...
Page 114: ...Troubleshooting 112 Electrical Control System 2 4 4 3 J4 malfunction J4...
Page 116: ...Troubleshooting 114 Electrical Control System 2 4 4 5 P6 malfunction P6...
Page 117: ...Troubleshooting Electrical Control System 115 2 4 4 6 J5 malfunction J5...
Page 119: ...Troubleshooting Electrical Control System 117 2 4 4 8 F0 malfunction F0...
Page 123: ...Troubleshooting Electrical Control System 121 2 4 4 12 J0 malfunction J0...