E-9
12. Loosen two screws, and remove the connector
cover on the back side of the RU conveyance
segment.
13. Connect two connector plugs of the power sup-
ply unit to the connector plugs of the convey-
ance segment, and secure the wire bundle with
two clamps as shown in the figure.
14. Secure the bundled connectors of the power sup-
ply unit with the clamp on the connector cover.
15. Install the connector cover on the RU convey-
ance segment (2 screws).
Note:
Put the wire bundle into the RU machine so that it
will not get hooked when the conveyance segment
is pulled out.
16. Install the back cover (included with the RU)
[Truss screw (black) M4x6: 2 pcs.: included with
the RU].
17. Install the front cover (included with the RU).
(1) Temporarily place two screws in the front of the
power supply unit (TP screw M4x6: 2 pcs.:
included with the RU).
15AQIXE055SB
Connector cover
15AQIXE056SB
Clamps
Power supply
connectors
Wire bundle
00AAIXE000SA
15AQIXE057SA
Clamp
15AQIXE058SA
Connector cover
15AQIXJ059SB
00AAIXE000SA
15AQIXE059SC
Back cover
Truss screws
(black) M4x6
00AAIXE000SA
A075IXE049CB
TP screws M4x6 (temporarily secured)