MAINTENANCE
SERVICE PROCEDURE
PW160-7H VEAM390100
269
CHECK FUEL LEVEL, ADD FUEL
WARNING
When adding fuel, never let the fuel overflow. This may cause
a fire. If fuel is spilled, thoroughly clean up any spillage.
1.
Use fuel gauge (G) on the monitor panel to check that the
tank is full.
2.
If the fuel level is below the E mark on the fuel gauge, add
fuel through filler port (F) while watching the float in the filler
port.
Fuel capacity: 290 litres
For details of the fuel to use, see "USE FUEL, COOLANT
AND LUBRICANTS ACCORDING TO AMBIENT TEMPER-
ATURE (232)"
After adding fuel, tighten the cap securely.
REMARK
If breather hole (1) on the cap is clogged, the pressure in the
tank will drop and fuel will not flow.
Clean the holes from time to time.
G
1
Summary of Contents for PW160-7H
Page 2: ......
Page 3: ...PW160 7H VEAM390100 3 FOREWORD ...
Page 12: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 12 PW160 7H VEAM390100 ...
Page 18: ...18 PW160 7H VEAM390100 ...
Page 220: ...TROUBLESHOOTING OPERATION 220 PW160 7H VEAM390100 ...
Page 305: ...PW160 7H VEAM390100 305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS PW160 7H VEAM390100 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 PW160 7H VEAM390100 2 PIECE BOOM ...
Page 345: ......