FUNCTIONING
TRANSPORTATION
3-103
8.
Install one shackle in the lifting hole provided in the boom,
then pass the metal cable through it.
9.
Connect the ropes to the upper lifting bar as indicated in
the figure.
NOTICE
q
Always use the three coupling points provided for
lifting the machine. Do not lift the machine with swing
boom or turret.
q
Pay attention to the pipes and take care that they do
not get caught.
10. Lift the machine slowly until the ropes are tense and check
that the clamps are correct before completely lifting the
machine.
CAUTION
q
Once the machine is lifted, check that it is properly
balanced and the rest remains in a horizontal position
during the lifting operations.
q
Do not lift the machine with the swing boom or without
using the lifting bar.
AA_1
AA_1
AA_2
AA_2
AA_1
AA_1
AA_2
AA_2
WEAM014500
Summary of Contents for PC22MR-3
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014500...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014500...
Page 88: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014500...
Page 208: ...TROUBLESHOOTING FUNCTIONING 3 120 WEAM014500...
Page 226: ...LUBRICATION MAINTENANCE 4 18 BALL BEARING RING GREASING POINTS 4 Grease WEAM014500...
Page 281: ...SPECIFICATIONS 15 WEAM014500...
Page 290: ...LIFTING CAPACITIES SPECIFICATIONS 5 10 WEAM014500...
Page 310: ...BUCKET WITH HOOK OPTIONAL EQUIPMENT 6 20 WEAM014500...
Page 311: ......
Page 312: ...2011 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 02 2011...