MAINTENANCE PLAN
185
4.7 MAINTENANCE PLAN
4.7.1 WHEN REQUIRED
4.7.2 MAINTENANCE EVERY 10 HOURS OF OPERATION OR EVERY DAY
4.7.3 MAINTENANCE EVERY 50 HOURS OF OPERATION OR EVERY 2
WEEKS
No.
PART
OPERATION
PAGE
a
Battery
Check electrolyte level
Inspect terminals and cables
b
Engine air cleaners
Check, clean or change
c
Cab air filter
Check and clean
d
Fuses and relays
Check and replace
e
Windshield washer reservoir
Check level
f
Windshield washer blades
Check
g
Cab door and engine hood hinges
Lubricate
h
Fork support rod
Lubricate
i
Fuel tank
Check fuel level
j
Brake oil reservoir
Top up brake oil
No.
PART
OPERATION
PAGE
a
Various checks
–
b
Acoustic alarms, warning lights and instruments
Check operation
c
Engine coolant
Check level
d
Radiator fluid
Check level
e
Engine oil
Check level
f
Tyres
Check pressure
g
Service brakes
Check
h
Parking brake
Check and adjust
No.
PART
OPERATION
PAGE
a
Articulated joints and sliding pads
Lubricate
b
Chain gear shafts
(for 3-section boom version only)
Lubricate
c
Water separator
Drain
d
Boom sections
Lubricate
Summary of Contents for 395F6001
Page 2: ......
Page 21: ...SAFETY DEVICES AND ACCIDENT PREVENTION MEASURES 19 ...
Page 23: ...SAFETY NOISE AND VIBRATION PLATES 21 395 93 11391 RKAA0400 ...
Page 24: ...SAFETY NOISE AND VIBRATION PLATES 22 RKAA0740 RKAA0720 ...
Page 25: ...SAFETY NOISE AND VIBRATION PLATES 23 RKAA0710 ...
Page 66: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 67: ...DESCRIPTION AND OPERATION OF THE MACHINE 65 ...
Page 168: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 169: ...MAINTENANCE 167 ...
Page 239: ...TECHNICAL DATA 237 ...
Page 253: ......
Page 254: ... 2004 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...