26
Figure 1 1 Cube Probe Location
Figure 2 Crusher Probe Location
3. Place the gasket around the top of the crusher before placing the ice machine above it.
See “Illustration B”.
4. Remove all panels to the ice machine. In order for defrost, safety switch, and bin probe
wires to run to or from the crusher. The knockout hole in the compressor area of the ice
machine needs to be removed. See “Illustration A”.
5. Lift and place the ice machine above the crusher. Fasten the machine to the crusher as
shown in “Illustration C”.
Summary of Contents for AKD-125
Page 9: ...9 equipment damage GT GB SCHEMATICS GT360 AIR LIQUID WIRING DIAGRAM ...
Page 10: ...10 GB GB560 AIR LIQUID WIRING DIAGRAM ...
Page 11: ...11 GT GB560 REMOTE WIRING DIAGRAM ...
Page 12: ...12 GB1064 AIR LIQUID WIRING DIAGRAM ...
Page 13: ...13 GB1064 REMOTE WIRING DIAGRAM ...
Page 21: ...21 6 Install gasket on top of dispenser See Illustration A ...