TP-5660 11/98
Installation 61
12. Follow
the
generator
set
manufacturer’s
instructions to adjust the generator output voltage
and frequency to match the nominal system
voltage and frequency shown on the transfer
switch nameplate if they are different.
The
automatic transfer switch will operate correctly only
to the rated system voltage and frequency
specified on the nameplate.
13. Move the generator set master switch to the AUTO
position.
14. Disconnect the emergency power source by
opening upstream circuit breakers or switches to
the transfer switch.
15. Connect the power switching device and controller
wiring harnesses together at the inline disconnect
plug.
16. Close and lock the transfer switch enclosure door.
17. Reconnect power sources by closing circuit
breakers or switches. The transfer switch may
signal the generator set to run for TDEC, if
equipped.
NOTE
When initially applying power to the transfer switch,
the engine start contacts remain closed signalling
the generator to run until the ATS’s Time Delay
Engine Cooldown (TDEC), if equipped, ends.
Installation of the transfer switch’s power switching
device is complete. Close and lock the enclosure door.
6.6.2 Automatic Operation Test
Test the transfer switch’s automatic control system. See
the logic controller operation and installation manual for
the test procedure.
6.7 Controller Setup
See the logic controller operation and installation
manual for controller startup and setup procedures.
6.8 Ensure Warranty Registration
The transfer switch seller must complete a Startup
Notification Form and submit it to the manufacturer
within 60 days of the initial startup date. A Startup
Notification Form is included with generator sets and
covers all equipment in the standby system. Standby
systems not registered within 60 days of the initial date
are automatically registered using the manufacturer’s
ship date as the startup date.
Summary of Contents for ZCS series
Page 16: ...TP 5660 11 98 8 Specifications Notes...
Page 30: ...TP 5660 11 98 22 Diagrams and Drawings Notes...
Page 45: ...TP 5660 11 98 Diagrams and Drawings 37 Schematic Diagram S340 Logic 600 1200 Amp 321096 C...
Page 46: ...38 Scheduled Maintenance TP 5660 11 98 Schematic Diagram S340 Logic 1600 3000 Amp 321097 A...
Page 54: ...46 Diagrams and Drawings TP 5660 11 98 Schematic Diagram M340 Logic 600 1200 Amp 321287 C...
Page 55: ...TP 5660 11 98 Diagrams and Drawings 47 Schematic Diagram M340 Logic 1600 3000 Amp 321301 B...