11. Complete the Valve Installation
Remove the plaster guard.
Turn on the main water supply.
Confirm proper operating of the transfer valve and associated
fittings.
Carefully inspect the entire installation for leakage and proper
operation. Adjustment as needed.
Hand tighten the plated nut to the brass body.
NOTE:
If the trim will not be installed immediately, reinstall the
plaster guard.
Cast Iron Baths
Other Baths
Mounting Nut
Plaster Guard
Cartridge
Auxiliary Shower Outlet Port
Cap
Bath Outlet Port
Plated Nut
Brass Body
Collar with Flange Down
Washer
Handshower Outlet Port
1/2" Male Adapter
Mixed Water Inlet Supply Port
Collar with
Flange Up
113762-2-CD
16
Kohler Co.