13
114189-2-
CA
(9608)
Kohler Co., Kohler WI
12. WATER TEST WHIRLPOOL AND ELECTRONICS
Check all electrical connections.
Make sure all pipe connections to the pump are securely
tightened.
Fill the whirlpool to a level at least 2” above the top of the
highest jet.
Operate the whirlpool for 5 minutes, and check all
whirlpool harness (piping) connections for leaks.
For additional information on whirlpool operation, see
Start-Up Whirlpool instructions on Page 15.
13. INSTALL APRONS
Locate the screws removed during the whirlpool
inspection.
This apron system is designed so the finish wall
materials go over the apron columns. It is also designed
so the finished floor materials butt up against the pan
base.
Slip the top of an apron up into the channel groove. Tilt
the apron inward. Align the bottom of the apron with the
pan base. The apron should align with both the bath rim
and the edges of the apron columns, and with the
pre-drilled holes in the pan base.
Secure the apron to the pan base with screws.
Repeat for the other apron.
Supplied Drywall Screw
Large Apron
Small
Apron
Supplied Drywall
Screws