1374956-T01-B
-7-
第二步:
安装机体组件:将机体组件支架的四个孔位安装于膨胀螺栓上,
按图示调整好高度后锁紧膨胀螺栓的螺母。用水平尺测量支架确
保水平。
第三步:
安装排杆组件:将排杆尾部按排杆口深度裁到合适的长度;将密
封圈塞入排杆预留口,插入排杆至指定位置,旋好螺母和插好溢
水软管。
Step 2:
Install the waterfoil lavatory-wall hung unit: Align the four holes
on the bracket of the waterfoil lavatory-wall hung unit with the
sleeve anchors. Adjust the height as shown in the figure and
tighten the nuts of the sleeve anchors. Measure the bracket with
a level ruler to ensure its levelness.
The top of the triangle
support is 719 high from the
ground. Tighten the nuts
after finishing adjustment.
Іઅݵ߫Їঀ֪வ
719
ͺ
લޅױե୧ব夊࠾
Waterfoil Lavatory-
Wall Hung Unit
ߑѽুў
M8 Sleeve Anchor
升剱夊ߺুў
Wall
ѽ
Measure the bracket with a level ruler to ensure that the
entire product is in a horizontal position.
ऀࡊٵؾࡹݵ߫ेґޅѽфսהйࡊٵѹ
719±
2
Step 3:
Install the drain assembly. Cut off the end of drain assembly
for an appropriate length according to the depth of the drain
assembly hole. Put the sealing ring into the drain assembly hole
and insert the drain assembly to the specified position. Screw
the nut and insert the overflow hose.
Big Nut
ם夊࠾
Washer
ֻ֥
Sealing Ring
إد֥
Lavatory
䥝
Drain Assembly
ߔুў
Gasket
إدֻ
Decorative
Cover
त
Drain Outlet
ࡊՍ
Water Level Base
ࡊѹڇ
Overflow Hose
࢜ࡊ
According to the depth of
drain assembly hole, cut
the drain assembly of this
area with a saw
߿݇ߔՍࢋچऀୱଠڢ
֪੶ि࠴Ԛֿङߔ