background image

Low Temperature Torque Apparatus  

Operation and Instruction Manual 

 

K18854,55,64,65-Manual

    

 

-

14-

 

5  Operation 

 

5.1  Preparation for Operation 

 

Preparing the ASTM D1478 Test Rig 

 

1. 

Follow the procedure outlined in ASTM D1478  
for  selecting  and  preparing  the  test  bearing. 
Use  the  supplied  bearing  spindle  and  grease 
cup to pack the test bearing.  

 

2. 

Insert  the  packed  test  bearing  into  the  test 
housing  and  secure  the  clamp  cap  securely 
over the test bearing 

 

Preparing the ASTM D4693 Test Rig 

 

1. 

Prepare  the  bearings  for  packing  by  solvent 
washing  them  as  per  the  method  and 
permitting them to air dry.  

 

NOTE:

 

New 

bearings 

must 

be 

conditioned  by  rotating  them  at  1000  RPM  at 
room temperature for 48 hours under a load of 
110 NM.  

 

2. 

Pack  the  bearings  with  the  test  grease  as 
specified  in  the  method  using  a  grease 
packer.  

 

3. 

Press the bearing cups into the test hub using 
the  supplied  cup  fixture  and  an  arbor  press. 
Be  certain  that  the  bearing  cups  are  fully 
seated in the housing.  

 

NOTE:

  Never  use  a  hammer  or  any 

other  object  to  “knock”  the  bearing  cups  into 
place.  This  may  result  in  damage  to  the  test 
housing.  

 

4. 

Slide  the  inner  bearing  onto  the  spindle 
locating  the  keyway  on  the  shaft  with  the 
notch  on  the  inside  of  the  bearing.  Be  careful 
not  to  rotate  the  bearings  during  assembly. 
Next,  place  the  bearing  housing  on  the 
spindle. Followed by the outer bearing.  

 

5. 

Install  the  inner  compression  plate  onto  the 
shaft  with  the  shouldered  end  facing  away 
from  the  hub.  Slide  on  the  spring  followed  by 
the outer compression plate with the shoulder 
facing the hub. Slip on the washer and thread 
on the nut, but do not tighten.  

 

6. 

Carefully mount the test assembly in a vertical 
position  in  a  vise  equipped  with  soft  jaws. 
Position the test spindle so that the flat face of 
the spindle contacts the jaws. Tighten the vise 
just enough to secure the spindle.  

 

7. 

Slip  on  the  brass  calibration  cylinder  and 
tighten the nut until the compression washer is 
flush  with  the  top  of  the  brass  cylinder.  The 
unit now has a 400N load on it.  

 

8. 

Slide the thermocouple into the end of the test 
rig  and  tighten  the  nut.  Remove  the  test  rig 
from the vise.  

 

9. 

Place  the  test  rig  in  an  oven  at  70°C  for  one 
hour  prior  to  testing,  as  per  ASTM  D4693 
specifications.  

 

5.2 

 

Operating Instructions 

 

1.  Set the Cold Chamber Temperature: 

 

a) 

Turn  the  POWER  Switch  to  the  ON 

position, followed by the BLOWER Switch.  

b) 

Set  the  temperature  by  using  the 

ascending  and  descending  arrows  on  the 
Chamber temperature control. 

c) 

When the chamber has cooled to the test 

temperature  as  indicated  on  the  chamber 
temperature display, allow several minutes for 
the 

temperature 

to 

stabilize 

before 

proceeding.  

 

2.  Insert the Test Rig:  

 

a) 

Open  the  cabinet  cover  and  latch  the 

cover supports in place.  

CAUTION: 

Never  leave  the  cover  open  while 

the  unit  is  unattended.  Injury  or  damage  to 
components  may  occur  should  the  cover 
unexpectedly  drop.  Remove  the  Plexiglas 
vapor barrier.  

b) 

Insert  the  test  rig  onto  the  appropriate 

shaft and fasten in place: 
 
ASTM D1478 

– Left 

ASTM D4693 

– Right 

 
For  ASTM  D4693:  Connect  the  thermocouple 
in  the  test  rig  to  the  plug  inside  the  cold 
chamber.  
 

3.  Position  the  Test  Rig  Relative  to  the  Load 

Cell: 

Summary of Contents for K18854

Page 1: ...mia New York 11716 1796 USA Toll Free 1 800 878 9070 US only Tel 1 631 589 3800 Fax 1 631 589 3815 http www koehlerinstrument com e mail info koehlerinstrument com Petroleum Testing Analysis Instrumen...

Page 2: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 1...

Page 3: ...rque Apparatus was manufactured in conformance with the applicable standards set forth in this certification Specifications ASTM D1478 ASTM D4693 ASTM D4950 FTM 791 334 This unit is tested before it l...

Page 4: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 3...

Page 5: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 4...

Page 6: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 5...

Page 7: ...information on subsequent processing or recycling prior to disposal of the equipment http www dpa system dk en WEEE Products Private or professional use Responsibility for Registration and Annual Repo...

Page 8: ...ely collected WEEE Mercury containing components such as switches or backlighting lamps compact fluorescent lamps CFL Batteries Printed circuit boards if the surface of the printed circuit board is gr...

Page 9: ...1 3 3 Setup 11 4 Descriptions 12 4 1 Instrument Controls 12 4 2 Temperature Controller Operation 12 5 Operation 14 5 1 Preparation for Operation 14 5 2 Operating Instructions 14 5 3 Calibration Proced...

Page 10: ...g needs Our products are backed by our staff of technically knowledgeable trained specialists who are experienced in both petroleum products testing and instrument service to better understand your re...

Page 11: ...instructions for preparing the equipment assume that the user is aware of the contents of this document which lists the warranty conditions and important precautions 3 1 Packing List Low Temperature T...

Page 12: ...medium otherwise damage may occur to the unit and the warranty will be void It is strongly suggested that a voltage stabilizer be used to prevent voltage variability The unstable voltage may cause dam...

Page 13: ...TM D4693 Test Rig Right side meter Over torque cut off feature The torque meter is equipped with an automatic cut off that interrupts power to the drive motor when measured torque exceeds a programmed...

Page 14: ...g device and the Process value displayed on the controller b Press the program key two times until PCt is displayed in the lower green LED display Press the DOWN key CAL will display on the lower gree...

Page 15: ...followed by the outer compression plate with the shoulder facing the hub Slip on the washer and thread on the nut but do not tighten 6 Carefully mount the test assembly in a vertical position in a vi...

Page 16: ...st Chamber After testing has been completed and the refrigeration system shuts down allow the test chamber to return to room temperature before wiping it dry with a clean cloth This will minimize fros...

Page 17: ...rod and slip on the weight marked 1 The strain gauge should display 11 lbs Each additional weight should register an additional 11 lbs Adjust the span screw to make any correction NOTE Handle weights...

Page 18: ...a suitable solvent and air dry Do not permit wet rigs to sit out as the components will corrode Wipe down the exterior of the cabinet using a soft cloth sprayed with household cleaner Over the course...

Page 19: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 18 8 Wiring Diagrams 8 1 K18864 Unit Wiring 220 240V 60Hz...

Page 20: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 19 8 2 K18865 Unit Wiring 220 240V 60Hz...

Page 21: ...turn of the product to the factory The sole responsibility of Koehler Instrument Company and the purchaser s exclusive remedy for any claim arising out of the purchase of any product is the repair or...

Page 22: ...Low Temperature Torque Apparatus Operation and Instruction Manual K18854 55 64 65 Manual 21 Notes...

Reviews: