background image

Site Specifications

SS2616-1 – 23NOV99

7

Plumbing Requirements

Water Supply:

Adequate water supply and drainage is the customer’s responsibility, and must be installed to specifications by the 
customer before installation of the PROCESSOR begins. 

A WATER SUPPLY PANEL for plumbed systems is available from Kreonite (WPS-A), and is recommended. 
Kodak will install flexible supply line to PROCESSOR and an electrical connection to the SOLENOID. The WATER 
SUPPLY PANEL should be wall-mounted within 4.9 metres (16 feet) of the rear of the PROCESSOR. 

Technical support and warranty of WATER SUPPLY PANEL is the responsibility of Kreonite.

Water to a plumbed system must meet the following specifications:

Flow rate: 3.8-20 liters per minute (1-5 gallons per minute) 

Temperature: Hot- 59 C (120 F) minimum temperature. Cold-27 C (80 F) maximum temperature. Practically, the 
water temperature should be adjusted to 

35C (95 F) to minimize the time necessary to bring the PROCESSOR to 

operating temperature.

Waste Water:

A floor drain should be located convenient to the PROCESSOR.

The drain system should conform to local specifications for silver-laden bleach-fix, and stabilizer or waste water.

Kodak will install a flexible drain TUBE to the PROCESSOR. The customer will be responsible for connection of 
the flexible drain TUBE to a locally approved drain system.

In unplumbed systems, the PROCESSOR is supplied with 10-litre CONTAINERS for easy transport of waste to the 
site waste facilities. Waste CONTAINERS will be located under the PROCESSOR.

A sink, 61 cm (24 in.)wide or larger, located near the PROCESSOR, is recommended for use during cleanup.

Venting Requirements

For a roll-to-processor system, 10 complete changes of air in the room per hour are required.

For a roll-to-roll printer, no venting is required.

Other

Telephone: The customer must supply a telephone line (with RJ11C modular phone jack) within 3 metres (10 feet) 
of the PRINTER to allow remote diagnostic support via modem. A high-grade analog service line is recommended.

Densitometer: An X-Rite DTP-36 densitometer is strongly recommended for calibration of the PRINTER and for 
process control. 

Summary of Contents for LED II PRINTER 20R - SITE

Page 1: ...iteSpecifications Production KodakServiceSupport Publication No SS2616 1 23NOV99 Supersedes SS2616 1 15JUL97 SITE SPECIFICATIONS for the KODAK PROFESSIONAL LED II PRINTERS 20P 20R KODAK PROFESSIONAL LED II PROCESSOR 20P G130_1000HA ...

Page 2: ...his information without notice and makes no warranty express or implied with respect to this information Kodak shall not be liable for any loss or damage including consequential or special damages resulting from any use of this information even if loss or damage is caused by Kodak s negligence or other fault Description Page Table of Contents Site Specifications 3 Space Requirements 3 Operating En...

Page 3: ... floor surface Floor pitch should not exceed 1 inch in 5 feet Operating Environment The unit to be installed is an Insulation Catagory Type II machine and operates in a Pollution Degree 2 environment in accordance with IEC 664 Normal Office Environment Room temperature changes of more than 5 degrees during operation will require recalibration of the PRINTER Although the PRINTER and PROCESSOR opera...

Page 4: ...ation Outside the US and Canada the region will supply the appropriate locally approved POWER CORD and PLUG The POWER CORD should be cretified and approved by a national test house Within the US and Canada the PROCESSOR is supplied with a 2 4 metre 8 foot POWER CORD which enters the cabinet from below The power receptacle must be located within 2 4 metres 30 cm 4 feet 1 foot of the rear of the PRO...

Page 5: ...r 4 5 meters 179 in 2 9 meters 114 in 30A 1 5 meters 60 in 91 meters 36 in minimum 91 meters 36 in 91 meters 36 in 91 meters 36 in minimum minimum minimum G130_0600DA 3 5 meters 3 meters 138 in 12 in 2 2 meters 3 meters 86 in 12 in _ _ _ _ SCSI 2 connection from host here 15A External modem connection here ...

Page 6: ...tance is between 6 and 22 9 metres 19 7 and 75 feet The customer must supply a SCSI 2 data CABLE and a SCSI 2 TERMINATOR for differential connection A differential SCSI 2 TERMINATOR is required Switching from a single ended to a differential SCSI 2 connection requires a reconfiguration of the FEE BOARD Refer to the INSTALL INSTRUCTIONS for detailed information on how to do this Locate SCSI 2 CABLE...

Page 7: ...ing temperature Waste Water A floor drain should be located convenient to the PROCESSOR The drain system should conform to local specifications for silver laden bleach fix and stabilizer or waste water Kodak will install a flexible drain TUBE to the PROCESSOR The customer will be responsible for connection of the flexible drain TUBE to a locally approved drain system In unplumbed systems the PROCE...

Page 8: ...Printed in U S A ss2616_1_23nov99 fm EASTMAN KODAK COMPANY Rochester NY 14650 Kodak is a trademark ...

Reviews: