![Kobold DON-05 Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/kobold/don-05/don-05_operating-instructions-manual_1982403021.webp)
DON-H
DON-H
01/0721
page 21
9.5.2
Re-assembly of DON-H15...DON-H20
Both oval gears are placed on the axle shafts with the magnets oriented towards
the upper meter body (4). Verify that the axle shafts are not loose. Both oval
gears are equipped with embedded magnets, allowing them to each be mounted
on either axle.
Install the rotors exactly perpendicular from each other (90° in orientation). They
will only work if installed precisely. Manually test full rotation after installation as
the rotors will not completely rotate freely unless installed precisely 90° from each
other.
Proper placement of the O-ring within the groove is necessary for leak free
operation. After placement, items (1 & 4) will then require assembly.
Tighten the upper meter body to the lower meter body (1 & 4) with the screws (5)
in an alternating pattern (1, 3, 2, 4). Tighten to each to a torque of 3.5 Nm. The
alternating tightening procedure is preferred for proper and even assembly.
Install the pulse detector board, the o-ring into the provided groove, and then
install either the electronic cover (9) or optional electronic assembly.
Exploded view of DON-H15...DON-H20
DON-H15...
optional
Summary of Contents for DON-05
Page 1: ...Operating Instructions for Oval Wheel Flowmeter High pressure Model DON H...
Page 9: ...DON H DON H 01 0721 page 9 Note The electronic option H0 is available with reed switch output...
Page 43: ...DON H DON H 01 0721 page 43 17 Statement of Conformity...
Page 44: ...DON H page 44 DON H 01 0721...
Page 45: ...DON H DON H 01 0721 page 45...
Page 46: ...DON H page 46 DON H 01 0721...
Page 47: ...DON H DON H 01 0721 page 47...
Page 48: ...DON H page 48 DON H 01 0721 18 State of safeness...