background image

4

ML Accessories Limited 

LU5 5TA
www.mlaccessories.co.uk

SBMAR18_V1

EMERGENCY TEST PROCEDURE

• Recommended routine test procedure in accordance with BS5266
• Daily check – check that the status GREEN LED indicator is illuminated
•  Monthly functional test – simulate a mains supply failure for approx. 30 secs by operation of key 

switch or switching off a circuit breaker. Ensure normal supply is restored after test and the 
indicator status LED is illuminated

TEST RECORD SHEET

FIRST YEAR

SECOND YEAR

THIRD YEAR

FOURTH YEAR

FIFTH YEAR

MONTH

TEST

SIGNED

DATE

SIGNED

DATE

SIGNED

DATE

SIGNED

DATE

SIGNED

DATE

1

FUNCTIONAL

2

FUNCTIONAL

3

FUNCTIONAL

4

FUNCTIONAL

5

FUNCTIONAL

6

1 HOUR

7

FUNCTIONAL

8

FUNCTIONAL

9

FUNCTIONAL

10

FUNCTIONAL

11

FUNCTIONAL

12

3 HOUR

Installed by: 

Installation date:

Contact number:

Reviews: