Determine boiler location
DIR #2000543097 00
LEFT
0” MINIMUM
TOP
6” MINIMUM
RIGHT
0” MINIMUM
FRONT
6” MINIMUM
BOTTOM
0” MINIMUM
1” MINIMUM CLEARANCE
AROUND VENT PIPE
1/4” MINIMUM CLEARANCE
AROUND HOT WATER PIPES
OPEN FRONT
Figure 1-2 Alcove Installation - Minimum Required Clearances
DIR #2000543098 00
LEFT
0” MINIMUM
TOP
6” MINIMUM
RIGHT
0” MINIMUM
FRONT
6” MINIMUM
6”
6”
BOTTOM
0” MINIMUM
1” MINIMUM CLEARANCE
AROUND VENT PIPE
1/4” MINIMUM CLEARANCE
AROUND HOT WATER PIPES
CLOSED DOOR
VENTILATING
AIR OPENING*
VENTILATING
AIR OPENING*
* AREA OF EACH OPENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES.
Figure 1-1 Closet Installation - Minimum Required Clearances
WARNING
For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.
WARNING
For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used
in an alcove structure due to
elevated temperatures. Failure to
follow this warning could result
in fire, personal injury, or death.
8
Required Clearances to Combustible Materials
- Front / Top .................................................................. 6"
- Bottom .......................................................................... 0"
- Left / Right Side .......................................................... 0"
Required Clearances to Combustible Materials
- Front / Top .................................................................. 6"
- Bottom .......................................................................... 0"
- Left / Right Side .......................................................... 0"