JUMPER SETTINGS
Jumper settings will need to be done by authorized personnel only. JP1 and JP2 control the wash cycle time.
Machine is factory set at 90 second wash cycle. Use table below to activate other wash cycles. Turn OFF main
power switch to change cycle times. Adjust Fill time, Fill start and other Pot's for proper operation.
NOTE: JP3 MUST BE CLOSED FOR PROPER OPERATION OF KLE 175GT.
JP3 MUST BE OPEN FOR PROPER OPERATION OF KLE 150GT.
JP4, JP5 and JP6 control proof of chemical delivery. They should be closed if proof of chemical delivery kit (P/
N 7501318 optional) is not installed. Machine can be ordered with proof of chemical delivery kit or kit can be
ordered separately.
PRIME CHEMICAL PUMPS
Each chemical pump can be primed simply by turning the delime switch to “ON” position during run time of
pump in wash cycle. This feature eliminates opening the control box lid to prime pumps using push button
prime switches.
CIRCUIT BOARD PUSH BUTTONS
Circuit board control done by authorized personnel only.
Detergent Push Button- Activities detergent pump if the main power switch is ON.
Sanitizer Push Button- Same as detergent
Rinse Push Button- Same as detergent
NORMAL OPERATION
1. Manually remove food debris from dishes, glasses, cups, etc. The better the pre-rinse the better the wash.
2. Place dishes, glasses, cups, etc. in dish rack. Do not stack dishes. Ensure glasses and cups are placed upside
down.
3. With the run power switch ON, close dish machine doors and machine will start. The wash cycle will take 90
seconds (120 or 72 seconds).
Page No. 4
(11/1001) Revision F, EO 4109 Part No. 9641606
Buzzer
Conn.
detergent
push button
sanitizer
push button
JP1
JP2
rinse push
button
JUMPER
72 SEC
90 SEC
120 SEC
360 SEC
JP1
OPEN
OPEN
CLOSED
CLOSED
JP2
CLOSED
OPEN
OPEN
CLOSED
JP4, JP5,
JP6
JP3