Topside System Controls and Indicators
3-17
SYS READY:
Green LED that will flash while the Rack Mount
TPU and the towfish are powering up and then
remain on when the Rack Mount TPU is ready to
link with SonarPro on the SonarPro Workstation.
T/F POWER:
Blue LED that is on when power is being output to
the towfish.
TOWFISH AWAKE:
Green LED that is on when the towfish is powered
and is acquiring data.
TOWFISH DOWNLINK:
Green LED that is on when commands are being
transfered from the Rack Mount TPU to the towfish.
TOWFISH UPLINK:
Green LED that is on when data are being transfered
from the towfish to the Rack Mount TPU.
EQUALIZATION
IN PROCESS:
Green LED that is on when cable equalization is
being executed.
EQUALIZATION
COMPLETE:
Green LED that is on when cable equalization has
completed successfully.
EQUALIZATION
FAULT:
Red LED that is on when cable equalization does
not complete successfully. When proper operation is
established, it will flash if telemetry errors are
detected.
STATUS TRIGGER:
Yellow LED that flashes when the sonar on the
towfish transmits.
STATUS TEST MODE:
Green LED that is on when internal system tests are
being performed.
STATUS AUX:
Blue LED that is on when power is applied to
optional components.
STATUS ERROR:
Red LED that flashes if system errors are detected
Summary of Contents for MA-X VIEW 600
Page 30: ......
Page 54: ......
Page 77: ...SP III TPU 5 7 Figure 5 3 SP III TPU Electronics Block Diagram...
Page 86: ......
Page 92: ......
Page 96: ......
Page 99: ...D 3...
Page 103: ...E 3...
Page 105: ...E 5...
Page 106: ......
Page 109: ...F 3...
Page 111: ...F 5...
Page 113: ...F 7...
Page 115: ...F 9...
Page 117: ...F 11...
Page 119: ...F 13...
Page 121: ...F 15...
Page 123: ...F 17...
Page 125: ...F 19...
Page 126: ......