Instruction
Manual
PK
120/30 page
20
_____________________________________________________________________________
5.1. Operation of the unit
1.) First you have to select the right dies (Pos.-No 2) for the intended application. Then
connect the crimping head (Pos.-No. 1) to the high pressure hose and roll out the hose
completely.
2.) Insert the dies laterally and bring the crimping head into position.
3.) Actuate the pump until the dies are completely closed.
The crimping process will proceed as described in chapter 4.2.
After the crimping process has been completed and the piston has been retracted remove the
connecting material from the crimping head.
5.2. Explanation of the application range
Our hydraulic crimping tool type PK 120/30 has a large number of
various dies (Pos.-No. 2) available to crimp primarily copper and
aluminium but also other connecting material.
Picture 2
Instruction
Manual
PK
120/30 page
20
_____________________________________________________________________________
5.1. Operation of the unit
1.) First you have to select the right dies (Pos.-No 2) for the intended application. Then
connect the crimping head (Pos.-No. 1) to the high pressure hose and roll out the hose
completely.
2.) Insert the dies laterally and bring the crimping head into position.
3.) Actuate the pump until the dies are completely closed.
The crimping process will proceed as described in chapter 4.2.
After the crimping process has been completed and the piston has been retracted remove the
connecting material from the crimping head.
5.2. Explanation of the application range
Our hydraulic crimping tool type PK 120/30 has a large number of
various dies (Pos.-No. 2) available to crimp primarily copper and
aluminium but also other connecting material.
Picture 2