8-1
TECH TIPS
SERVICING THE ICE BIN AUGER ASSEMBLY
1.
Open the freezer door.
2.
Remove the ice bin from the door by
pressing in on the release button and
lifting it off the platform.
3.
Place the ice bin on a work surface with the
bottom facing up.
AUGER DISASSEMBLY
1.
Insert a screwdriver handle into the auger
blade area to prevent the blades from
turning when you remove the screw in the
next step (see the photo at the top of the
right column).
2
Remove the screw from the auger assem-
bly coupling, and pull the coupler and flat
washer off the end of the shaft. NOTE: The
screw may be difficult to remove if there is
sealant applied to the threads.
Release Button
Screw, Coupler, &
Flat Washer
Screwdriver Handle
3.
Turn the ice bin over to its upright position.
4.
Remove the two screws from the auger
mounting plate.
Continued on the next page.
Auger Mounting
Plate Screws
Summary of Contents for 2003 M
Page 10: ...1 6 NOTES ...
Page 60: ...4 36 NOTES ...
Page 80: ...6 10 NOTES ...
Page 81: ...7 1 WIRING DIAGRAMS STRIP CIRCUITS SXS NON DISPENSER WIRING DIAGRAM 115 VOLTS 60 HZ ...
Page 82: ...7 2 SXS DISPENSER WIRING DIAGRAM ...
Page 83: ...7 3 BOTTOM MOUNT WIRING DIAGRAM ...
Page 84: ...7 4 MAIN CONTROL BOARD BLOCK DIAGRAM ...
Page 85: ...7 5 ELECTRONIC TEMPERATURE CONTROLLED MEAT PAN DIAGRAM ...
Page 93: ...8 3 NOTES ...
Page 94: ...8 4 NOTES ...
Page 96: ......