5-8
Refer to page 4-26 for the procedure for servic-
ing the auger motor.
CHECKING THE AUGER MOTOR
To check voltages* at the motor for crushed
or cubed ice operation:
1.
Open the freezer door and remove the ice
bucket from the door.
2.
Tape or block the freezer door switch
closed.
NOTE: When you are instructed to make a
reading at the motor connector, press the tips
of the red and black test leads into the indi-
cated harness connector slots so they touch
the bare metal wire connectors (see the pho-
tos at the top of the right column). Reach
around the front of the door and press the ice
dispenser lever to activate the dispenser
switch.
* Voltage readings may vary, depending on the supply
voltage, and the type of test equipment being used.
Pin 1
Motor Harness
Connector
Electrical Shock Hazard
Voltage is present during these tests.
Press Tips Into
Connector Slots
Against Bare Wire
Terminals To
Check Voltages
3.
Press the
Unlocked
button on the water
and ice dispenser front panel.
4.
Touch the AC meter test leads to wire
harness pins 3 and 5, then press the ice
dispenser lever. The meter should indi-
cate 115 VAC.
5.
Touch the DC meter’s black test lead to
wire harness pin 6, and the red test lead to
pin 7, then press the ice dispenser lever.
The meter should indicate +115 VDC
±
10%.
6.
Press the
Crushed
ice button on the water
and ice dispenser front panel.
Pin 1
Motor Connector
Press The Ice
Dispenser Lever
Test Leads
Summary of Contents for 2003 M
Page 10: ...1 6 NOTES ...
Page 60: ...4 36 NOTES ...
Page 80: ...6 10 NOTES ...
Page 81: ...7 1 WIRING DIAGRAMS STRIP CIRCUITS SXS NON DISPENSER WIRING DIAGRAM 115 VOLTS 60 HZ ...
Page 82: ...7 2 SXS DISPENSER WIRING DIAGRAM ...
Page 83: ...7 3 BOTTOM MOUNT WIRING DIAGRAM ...
Page 84: ...7 4 MAIN CONTROL BOARD BLOCK DIAGRAM ...
Page 85: ...7 5 ELECTRONIC TEMPERATURE CONTROLLED MEAT PAN DIAGRAM ...
Page 93: ...8 3 NOTES ...
Page 94: ...8 4 NOTES ...
Page 96: ......