9
Installation of optional Fan Kit
#8x1/2”
FAN MOUNTING SCREWS
MOUNT FROM INSIDE OUTER RAP.
MOUNTING POSITION OF THERMO DISK
LOCATED LEFT SIDE AND BEHIND VALVE.
VARIABLE SPEED CONTROL
SUGGESTED LOCATION’
FOR 120V JUNCTION BOX
FOR FAN KIT.
120V
Fan Mounting Instructions: Z33FK-FAN ASSEMBLY
1. Attach thermodisk securely to bottom of firebox. Screws are factory installed.
2. Screw #8 x 1/2” screws into outer rap wall from the inside (right side only). Fan housing can
now be positioned by placing teardrop holes over the 2 screws mounted in the outer rap
wall.
3. Junction box should be mounted to opposite side and wired to variable speed control and
120V power.
4. Plug fan into junction box and attach the 2 leads exiting the fan housing into the thermodisk.
Electrical Services
All optional fan kits are equipped with a 120V, 60 Hz
blower.
Note: All electrical connections are to be made in
accordance with CSA Standard C22.1 - Canadian
Electrical Code part I or with the National Electrical
Code, ANSI/NFPA 70 (latest edition) and/or in accor-
dance with local codes.
WARNING:
A
qualified electrician must
connect electrical wiring to
junction outlet for built-in
installation
WARNING: Electrical Grounding Instructions.
This appliance is equipped with a three-pronged
(grounding) plug for your protection against shock
hazard and should be plugged directly into a properly
grounded three-prong receptacle. Do not cut or remove
the grounding prong from this plug.
WARNING: Label all
wires prior to disconnection
when servicing controls.
Wiring errors can cause
improper and dangerous
operation.
Verify proper operation after
servicing.