ZCV39 / ZCV42 Basic Finishing 6: With MQZCV42DD & Stone, Brick, or Tile Border
Step One: Frame Fireplace with nailing tabs oriented as
shown.
Step Two: Use Drywall to finish face of wall.
NOTE: Wall will be flush with fireplace face.
Step 3: A stone, brick, or other non-combustible border
may be applied to the wall. Maintain clearances from
fireplace opening below.
IMPORTANT NOTE!
When installing stone, brick, or other
material around the perimeter of the surround:
You MUST Leave 2-5/8” of the fireplace face exposed around
the fireplace opening on the Sides, 2” at the Bottom, and 3-
1/8” must be exposed on the top. This is to install and remove
the Door Frame. See drawings below.
A Tile Lip Kit (ZCV-TLK) is available.
Nailing Tab
Fireplace Frame
2
-5
/8
” M
IN
Drywall
3-1/8” MIN
Stone, Brick, Tile, etc.
Back Frame of
MQZCV42DD Door
ZCV39
Fireplace
Opening
Required Clearance
Required Clearance
ZCV42
Fireplace
Opening
2-5/8”
(Continued)
Bottom of
Fireplace
2” Bottom
of Fireplace
2-5/8”