ATTACHING TO TRACTOR continued....
STEP 6
Raise rotary tiller and remove blocking. Raise and lower rotary tiller in
order to locate the longest distance between equipment input shaft and
the tractor PTO output shaft. With the rotary tiller in the longest distance
position shut down the tractor and SECURELY BLOCK THE ROTARY
TILLER IN POSITION.
STEP 7
As in step 5 hold PTO shaft sections together and check for a minimum
of 6 inches of overlap. If PTO shaft has been marked for cutting the
overlap is the distance measured between the two marks. If the PTO
shaft has less than a 6 inch overlap, DO NOT USE. Contact your autho-
rized King Kutter II Dealer.
NOTE
If the PTO shaft length is too long go to SIZING PTO SHAFT (pg. 18)
STEP 8
Apply any multi-purpose grease to the outside of the male (inner) PTO
shaft section. Assemble PTO shaft and install on rotary tiller and trac-
tor.
STEP 9
Pull on tractor side of PTO shaft yoke to be sure it has locked in place.
Make certain PTO shaft shielding is in place and good working condi-
tion.
STEP 10
The PTO shaft shield is a non-rotating design and must be secured
prior to equipment use. Using the chain on each yoke shield attach to a
fixed object on the tractor and equipment ends that will not allow the
PTO shaft shield to rotate during operation.
17
Summary of Contents for 999995
Page 2: ...2...
Page 10: ...Figure D Figure F Figure H 10 Figure E Figure G Figure I...
Page 23: ...23 1...
Page 24: ...24 2 3...
Page 25: ...4 5 25...
Page 26: ...6 7 26 7...
Page 27: ...27 Notes...
Page 28: ...28 TILLER EXPLODED VIEW...
Page 32: ...32 TG SERIES SIDE GEARBOX 184069...