
RC03-PCR-LA
Operation Check 3-1
Chapter 3
Operation Check
Describes the operation check that must be conducted prior to opera-
tion of the Remote Controller.
After connecting the Remote Controller by the steps described in
Chapter 2, check the Initial Setup Status and make an operation
check. Always make an operation check as described in this chapter,
if you have installed a new Remote Controller or changed its location,
if the operator changes, or if the Remote Controller has not been used
for a long time.
Before operating this device, read through the PCR-LA AC Power
Supply Operation Manual and gain an understanding of the basic
operations of the AC power supply.
3.1
Checking the Initial Setup Status
The condition in which a PCR-LA AC power supply and this device
are simultaneously purchased and power is fed for the
fi
rst time (fac-
tory shipment status) is called Initial Setup Status.
The main setting in the Initial Setup Status are as follows:
• OUTPUT
OFF
• RANGE
100 V
• AC/DC
AC
• Frequency
50.00 Hz
• Voltage
0.0 V
• Display mode
Voltmeter
If the Remote Controller is not in the Initial Setup Status, use the reset
function to activate the Initial Setup Status. Reset can be performed
either on the PCR-LA AC power supply or via the Remote Controller.
To perform a reset on the PCR-LA AC power supply, see instructions
in the PCR-LA AC Power Supply Operation Manual.
Note that performing a reset cancels all settings made thus far and
activates the Initial Setup Status.