46
E:
On the outside of the assembly place 1 (1941) Water Sand Support overlapping Brookridge Tarp by 1” and
flush to the outside edges of both (1931) Posts. Make sure the board is level then attach with 4 (S3) #8 x 2-1/2”
Wood Screws. (fig. 28.3)
F:
Attach (2028) Cafe Top tight to the top of (1941) Water Sand Support with 3 (S7) #12 x 2” Pan Screws. Make
sure the notched edges are tight to the posts, . (fig. 28.3)
G:
From the inside of the assembly and 1/2” in from the edge of the tarp, attach tarp to (2036) Cafe Ground and
(1941) Water Sand Support with 4 evenly spaced (S5) #8 x 1/2” Pan Screws (with #8 flat washer) per board. The
distance between screws should be 8”. (fig. 28.4)
H:
Tighen the previously loosened bolts.
Wood Parts
Hardware
Step 28: Cafe Wall Assembly
Part 2
4 x
#8 x 2-1/2” Wood Screw
8 x
#8 x 1/2” Pan Screw (#8 flat washer)
3 x
#12 x 2” Pan Screw
S3
1 x
Cafe Top 5/4 x 4 x 35-7/8”
1 x
Water Sand Support 2 x 2 x 35-7/8”
2028
1941
S7
S5
Fig. 28.3
1931
Outside Fort View
Fig. 28.4
S7
2028
2036
1931
1941
15”
S3
S3
2036
1941
S5
8”
8”
8”
Inside Fort View
S5