
74
2 x
Roof End 1-1/4 x 3 x 10”
2 x
Roof End Left 1-1/4 x 3 x 10”
12 x
#8 x 2” Wood Screw
Fig. 31.2
2647
2627
Hardware
Wood Parts
A:
On (2627) SW Wall Panel and (2622) End Panel Assembly place 1 (2646) Roof End flush to the top of the
panel on the right hand side, measure overhang so it is 2-5/8” then attach with 3 (S11) #8 x 2” Wood Screws per
board. (fig. 31.1, 31.2 and 31.3)
B:
Repeat Step A for 2 (2647) Roof End Lefts. (fig. 31.1, 31.2 and 31.3)
Step 31: Attach Roof Ends
Part 1
S11
Flush
Flush
2-5/8”
Overhang
2646
2622
2618
Front
Back
S11
2647
Fig. 31.3
Top View
2646
2-5/8”
Overhang
2618
2647
Swing Wall
Fig. 31.1
Left Side
2684
2684
2677
2677
S11
2622
2622
S11
Side View
2677
2677
2684
2684
2646
2646
2647
Summary of Contents for BEAR CAVE LODGE
Page 149: ...149 NOTES...
Page 150: ...150 NOTES...
Page 151: ...151 NOTES...
Page 152: ...152 NOTES...