
114
2 x Swing Bracket
Other Parts
Hardware
4 x
1/4 x 1-3/8” Wafer Lag (1/4” flat washer)
WL3
1/4” Flat
Washer
WL3
Step 61: Attach Tunnel Assembly Frame to Fort
Part 2
E:
From underneath the tunnel place 1 Swing Bracket on each end of the (6036) Tire Joist. Pre-drill holes using
a 1/8” drill bit and connect to the structures using 2 (WL3) 1/4 x 1-3/8” Wafer Lags (with flat washers) per side.
(fig. 61.4)
Fig. 61.4
Underneath View
6036
Summary of Contents for BEAR CAVE LODGE
Page 149: ...149 NOTES...
Page 150: ...150 NOTES...
Page 151: ...151 NOTES...
Page 152: ...152 NOTES...