
107
1 x
Tire Joist 63.5 x 82.6 x 1700.2mm
2 x Swing Hanger
6036
Fig. 56.1
Fig. 56.2
Wood Parts
Other Parts
Step 56: Attach Swing Hangers to Tire Joist
6’ Tunnel & Tire Swing Assembly
A:
Position 1 (6036) Tire Joist so that the counter sunk holes are at the top. Attach the Swing Hangers from
underneath (2 flat washer and 1 lock nut per swing hanger) as shown in fig. 56.1 and 56.2.
6036
6036
Swing Hanger
5/16” Flat
Washer
5/16” Flat
Washer
5/16” Lock
Nut
Counter sunk hole
Summary of Contents for BEAR CAVE LODGE
Page 149: ...149 NOTES...
Page 150: ...150 NOTES...
Page 151: ...151 NOTES...
Page 152: ...152 NOTES...