TS-5020 Automotive Electronics Functional Test System Site Preparation and Installation Guide
iii
Table of Contents
Warranty 1-2
Technology Licenses 1-2
Restricted Rights Legend 1-2
Service And Support 1-3
Keysight On The Web 1-3
Keysight By Phone 1-3
Safety and Regulatory Information
Safety Information 2-2
Safety Summary 2-2
Safety Notice 2-2
General 2-2
Environmental Conditions 2-3
Before Applying Power 2-3
Ground The System 2-4
Fuses 2-4
Operator Safety Information 2-4
Safety Symbols and Regulatory Markings 2-5
Declaration of Conformity 2-7
Electrostatic Discharge (ESD) Precautions 2-8
End of Life: Waste Electrical and Electronic Equipment (WEEE) Directive
2002/96/EC 2-9
Site Preparation and Power Requirements
Preparing Your Site for the System 3-2
Typical System 3-3
System Dimensions 3-4
System Plan Drawing 3-5
Minimum Power Requirements 3-7
Power Recommendations 3-7
Additional Power Information 3-9
Mains Disconnect Requirements 3-10
Disconnect Circuit Breaker Requirements 3-10
Mains Circuit Breaker Requirements 3-10
Site Configuration for AC Power 3-11
Important recommendations about wiring 3-11