Installation Note N5222-90133 9
Description of this Upgrade
Installation Procedure for the Upgrade
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
Overview of the Installation Procedure
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
All instruments:
upgrade pna FW
“Step 1. Remove the Inner and Outer covers” on page 10
“Step 2. Remove Bottom Assemblies and Cables” on page 10
“Step 3. Remove Most Top Assemblies and Cables” on page 12
1
CA Assy, RF CA, SYNTH J11-SPAM J3 – W200
N5240-60115
1
Cable assy-fan (MB-PCB)
N5240-60116
1
PCA Fan
N5240-63130
1
Label, SRC3 J13 – Rear panel – (Option 422/423 Only)
N5240-80042
1
Bracket-side, left (outer)
N5242-00054
1
Rail- left side (inner)
N5242-00055
Table 1
Contents of Upgrade Kit N5242-60133 Option 4S7
Qty
Description
Part Number
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.