44 Installation Note N5222-90133
Description of this Upgrade
Step 22. Prepare the PNA for the User
-
Step 22. Prepare the PNA for the User
1.
If necessary, reinstall front jumper cables.
2.
Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3.
Install the dust caps on the test ports.
4.
If necessary, install labels included in kit as required (e.g., KCC, two
person Caution, and SRC3 J13).
5.
Clean the analyzer, as needed, using a damp cloth.