20
Keysight N4917CPCA Optical Receiver Stress Test for CPRI Fronthaul Networks User Guide
2
System Requirements for N4917CPCA
Recommended Setup using DCA-X
Connect the equipment and cabling as shown in
Figure 3
.
Figure 3
Optical Receiver Stress Test Calibration with DCA-X