
Troubleshooting
2
LCR Meter
53
Step 11.
After the restart, execute initial registration. For
information on the execution procedure, refer to
Registration of E4982A" on page 38
Step 12.
Execute the calibration of the touch screen. For
information on the execution procedure, refer to
of the Touch Screen" on page 44
.
C A U T I O N
Never turn off the power during the system recovery because doing
so may cause serious damage to the E4982A.
Summary of Contents for E4982A
Page 2: ......
Page 3: ......
Page 33: ...Installation 1 LCR Meter 31 Figure 7 Attaching test head to a handle etc...
Page 48: ...46 LCR Meter 1 Installation...
Page 56: ...54 LCR Meter 2 Troubleshooting...
Page 58: ...56 LCR Meter Index...
Page 59: ...57 1 As of 21 01 04...
Page 60: ...58 LCR Meter...
Page 61: ......