
22
LCR Meter
1
Installation
Ensuring Adequate Free Space around Meter for Immediate
Disconnection of Power Cable in Case of Emergency
“Disconnection from Supply Source" on
, the power supply is disconnected by removing the
power cable’s connector plug from either the AC outlet or
the E4982A unit. When installing the E4982A, ensure that
there is sufficient free space around the unit to permit quick
disconnection of the plug (from AC outlet or E4982A unit) in
case of emergency.
Figure 2
Example of the static-safe work station
Summary of Contents for E4982A
Page 2: ......
Page 3: ......
Page 33: ...Installation 1 LCR Meter 31 Figure 7 Attaching test head to a handle etc...
Page 48: ...46 LCR Meter 1 Installation...
Page 56: ...54 LCR Meter 2 Troubleshooting...
Page 58: ...56 LCR Meter Index...
Page 59: ...57 1 As of 21 01 04...
Page 60: ...58 LCR Meter...
Page 61: ......