11
Keysight 16089A/B/C Kelvin Clip Leads
Operation and Service Manual
2
Preparation for Use
Introduction
This chapter explains how to install the Keysight 16089A/B/C Kelvin Clip
Leads. The topics covered include initial inspection, ambient environmental
considerations, connecting the test leads for use, and repackaging the test
leads for shipment.
Initial Inspection
These test leads have been carefully inspected electrically and mechanically
before being shipped from the factory. They should be in perfect physical
condition, no scratches, dents or the like. They should also be in perfect
electrical condition. Verify this by carefully performing an incoming inspection
to check the test lead set for signs of physical damage and missing contents.If
any discrepancy is found, notify the carrier and Keysight Technologies. Your
Keysight Technologies sales office will arrange for repair and replacement
without waiting for the claim to be settled.
• Inspect the shipping container for damage. Keep the shipping materials
until the inspection is completed.
• Verify that the shipping container contains everything shown in
,
.
• Inspect the exterior of the 16089A/B/C for any signs of damage.
Summary of Contents for 16089A
Page 1: ...Operation and Service Manual Keysight 16089A B C Kelvin Clip Leads...
Page 4: ...4 Keysight 16089A B C Operation and Service Manual Contents...
Page 16: ...16 Keysight 16089A B C Kelvin Clip Leads Preparation for Use Packaging the Test Leads 2...
Page 20: ...20 Keysight 16089A B C Kelvin Clip Leads Preparation for Use OPEN and SHORT Compensation 3...
Page 26: ...26 Keysight 16089A B C Kelvin Clip Leads Service Replaceable Parts 4...