The functional check is successful if the following procedures
are carried out as described:
Level alarm is triggered, the alarm LED (2) flashes red, a
signal tone is generated and the wastewater pump starts
to empty the system tank.
After reducing the level below the alarm threshold, the
alarm LED (2) extinguishes and the two orange LEDs
(level (3) and pump operation (4) / (5)) illuminate until the
system tank has been emptied by the wastewater pump.
Visual inspection:
Once the wastewater pump has stopped running, only a
few centimetres of water should be left in the system tank.
Fasten the cover plate back onto the system.
The system is ready for operation
EN
016-102_05
Pumping station / Installation and operating manual
79 / 144
Summary of Contents for Aquapump Small
Page 13: ...3 4 Funktionsprinzip DE 016 102_05_DE_EN_FR Pumpstation Einbau und Bedienungsanleitung 13 144...
Page 59: ...3 4 How it works EN 016 102_05 Pumping station Installation and operating manual 59 144...
Page 140: ......
Page 141: ......
Page 142: ...142 144 016 102_05_DE_EN_FR...
Page 143: ...016 102_05_DE_EN_FR 143 144...