5
Initial commissioning
5.1
Switch on and off
Connect the battery
Connect the battery connector(s) (2).
5.1.1
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
Initialisation starts automatically.
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
|3.10. Language|
is displayed.
Switch on
Turn main switch (1) into ON position. After a successful sys-
tem test, the display shows
|0 System info|
and the
green LED signals readiness.
If the display does
not
show initialisation (
|3.10. Lan-
guage|
) the control unit has already been initialised. In
this case, the set parameters must be checked, or reset to
the factory settings (
|3.11 Reset|
). After resetting to
the factory settings, the initialisation of the control unit starts
automatically.
Please note that the counter for the maintenance interval is
not changed by the resetting to the factory settings.
5.2
Carrying out initialisation
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|System variant|
|Power rating|
EN
010-532_02_SON
Installation and operating instructions
65 / 124
Summary of Contents for Aqualift Comfort 400V Duo
Page 41: ...010 532_02_SON 41 124 ...
Page 123: ...010 532_02_SON 123 124 ...