4.8
Backfill the excavation pit
CAUTION
Note the structural calculations for traffic safety. Chamber installation for load class D makes a load distribution plate
made of reinforced concrete necessary (exception: not necessary for standard road construction).
Determine the required load class and structural calculations in accordance with the environment / use condi-
tions.
Request an appropriate reinforcement drawing from the KESSEL hotline.
(1)
Subsoil (crushed stone)
(5)
Ground
(2)
Tank bed (sand)
(6)
Base course
(3)
Separator according to the structural calculations
(7)
Top of tank
(4)
Back fill material (crushed stone)
(8)
Load distribution plate (for load class D)
Fill the excavations with crushed stone (0-16 mm diameter), at least 50 cm all around; place in layers of maximum 30 cm
and compact each layer of fill material properly to 97% Dpr (e.g. using vibrating plate).
At the same time, the tank must be filled with water so that a maximum difference of 30 cm exists between the liquid level
and the level of the fill material.
The required excavation pit slope angle β must be observed all the way round.
The assignment of internal frictional angle φ of the fill material, and permissible excavation pit slope angle β must be car-
ried out in accordance with EN 4124.
EN
010-224
Installation and operating instructions
31 / 116
Summary of Contents for 93007/120D
Page 19: ...7 2 1 Anlagenpass DE 010 224_01 19 116...
Page 37: ...7 2 1 System passport EN 010 224 Installation and operating instructions 37 116...
Page 55: ...7 2 1 Fiche syst me FR 010 224 Instructions de pose et d utilisation 55 116...
Page 73: ...7 2 1 Scheda dell impianto IT 010 224 Istruzioni per l installazione e l uso 73 116...
Page 91: ...7 2 1 Installatiepaspoort NL 010 224 Inbouw en bedieningshandleiding 91 116...
Page 110: ...PL 7 2 1 Paszport techniczny 110 116 Instrukcja zabudowy i obs ugi 010 224...
Page 111: ......
Page 112: ......
Page 113: ...010 224_01 113 116...
Page 114: ...010 224_01 114 116...
Page 115: ...010 224_01 115 116...