
UBS Hydro II
Assembly/set up, installation, first commissioning
EN
2018-05-02
28 / 60
•
During assembly, definitely make sure that the coupling cam (3) is in one of
the two halves of the coupling.
•
Pull the locking lever (1) up and turn the lever up.
•
If the fixture of the attachment should not be able to be pushed into the
wearing bush (2), possibly the teeth of the two halves of coupling stand
against each other. If the auxiliary drive is switched on and the starter rope
of the engine is pulled slowly, the driving shaft turns further on and with this,
the coupling can be pushed in further.
•
Turn the locking lever (1) down again and make sure that the locking pin
snapped in completely.
5.3
Assembly of grid wheels (optional)
Fig. 6: Assembly of grid wheels
1
Butterfly screw
2
Lock washer
3
Cam plate
4
Grid wheel
5
Hexagon nut
6
Washer
7
Attachment hub
8
Stop nut
9
Wheel bolt M12 x 50
For the assembly of the set of grid wheels, the attachment hubs (7) must be
mounted on the two sides of the self-propelled working machine