5
Conditions of use
►
Observe the operating conditions for wa-
ter heating installations as defined in
DIN 18380 "VOB German Contract Proce
-
dures for Building Services".
►
Maintain water quality as defined in VDI
2035 "Prevention of damage in water heat-
ing installations".
►
Observe the limitations for use in damp
rooms as defined in DIN 55900 "Coatings
for radiators".
►
Use radiator only in closed heating systems.
►
Store and transport radiator only in the
protective packaging.
►
Observe minimum clearances between ra-
diator and surrounding objects for air cir-
culation.
Complaints
►
Please contact the supplier.
Disposal
►
Packaging and any parts that are not need-
ed should be recycled or disposed of prop-
erly. Observe local regulations.
Technical features
•
Operating pressure: max. 10 bar
•
Test pressure: 1.3 x operating pressure
•
Flow temperature: hot water up to 110°C
(230°F)
Installation
Bracket installation (see Fig. 1–8)
►
Check fasteners for
damage.
►
Prepare tools and fastening materials
(screws, washers and wall anchors). Use
only approved screws and wall anchors to
ensure the required load-bearing capacity
for the radiator (available separately from
the manufacturer).
►
Mark position for upper holes to be drilled:
–
For reference dimensions, see Fig. B.
►
Drill holes and insert wall anchors. Note
walling material.
►
Position, attach, align and secure brackets
based on the desired wall spacing.
►
Install lower locking screws. Ensure that
the wall anchor is flush with the front edge
of the bracket.
►
Attach sound-absorbing clips to all brack-
ets.
►
Attach lift restraints to the outer brackets.
Heater installation (see Fig. 9–10)
Protect radiator from damage
►
When installing, only remove protective
packaging at the fastening and connection
points.
►
Only remove protective packaging com-
pletely during final cleaning or prior to
commissioning.
Compact radiator connection
►
Unscrew painted blind plugs at the desig-
nated connection points.
►
Connect radiator with commercially avail-
able fittings upstream.
►
Tightly cap open connections with vent
plugs (top) and blind plugs.
Only existing blind plugs may be used on Ker-
mi steel panel radiators.
Valve radiator connection
Valve with factory pre-set k
V
value (see manu-
facturer's data).
►
Vent plugs (top) and blind plugs are factory
pre-assembled.
►
Remove painted caps on the valve mount-
ings and dispose of, as they must not be
used as seals on the radiator.
►
Connect radiator with commercially avail-
able fittings upstream on the valve mount
-
ings.
Special connections
►
See manufacturer's data.
Commissioning
►
Fill the radiator and vent the radiator.
Risk
of scalding!
►
Check radiator and connections for leaks.