10
I
nstallation
Panel
Remove the front cover by unscrewing the 4 M3 TX20 screws.
Using the shower fixing bracket, mark and drill holes for
shower fixing bracket on the back of the shower cubicle and
secure bracket using the rawl plugs and screws supplied.
1
Connect blended water feed either directly to ½”BSP Solenoid
connection, or use flex hose provided with 15mm push fit connection.
For thermostatic panel connect hot and cold feeds to TMV3
mixer ½”BSP compression fittings, flex hose extensions
are supplied with 15mm push fit connections. See TMV3
mixer instructions for commissioning and servicing details.
2
Take care to ensure cables and pipes are not pinched
when front panel is fitted. Secure front panel with 4 x
Tx25 screws (supplied Tx25 Allen key can be used). For
thermostatic panel fit control handle with Allen key provided.
3
4
Run the low electrical power cable from the power
supply,protected by 32A 30mA RCBO and 3A switched fused
spur in compliance with all IEEE standards and local building
standards and regulations, to the control hub. See ELECTRICAL
INSTALLATION for connecting power supply cable to hub.
!
Remember!
Always check for hidden pipes + cables before drilling.
Warning: Run water through plumbing to clear debris from pipework before connecting to Kelda panel.
Take
caution when removing the front cover as the Digital push button is attached to the Control Hub with a cable.
190mm horizontal
mounting holes
Mixed
water feed
connection
1000mm vertical
mounting holes
Hot and
Cold supply
connections
Timed Flow
(93001000 / 93003000)
Timed FlowThermostatic
(93002000/ 93004000)
Cold feed 15mm
Hot feed 15mm
150mm
Centres