
Main CPU firmware replacement
Changing the firmware may be necessary as upgrades become available. The firmware
revision levels for the main and front panel CPUs are displayed during the power-on sequence.
(The main firmware revision level is displayed on the left; the front panel firmware revision level
is displayed on the right.) For example: REV: A01 A02 indicates a main firmware revision level
of A01 and a front panel firmware revision level of A02.
The firmware for the main CPU is located in the EPROMs U102 (EVEN) and U103 (ODD),
leadless ICs that reside in chip carriers on the PC board. To replace the CPU firmware, do the
following:
WARNING
Disconnect the instrument from the power lines, and remove the test leads
before changing the firmware.
1.
Remove the case cover as described earlier in this section.
2.
Locate U102 EVEN and U103 ODD (EPROMs) on the motherboard. They are the only
devices installed in chip carriers (sockets).
CAUTION
EPROMs U102 and U103 are static-sensitive devices. Be sure to follow the
handling precautions explained in Static sensitive devices.
3.
Using an appropriate chip extractor, remove U102 from its chip carrier.
4.
Position the new U102 EPROM on the appropriate chip carrier. Make sure the notched
corner of the chip is aligned with the notch in the chip carrier.
NOTE
Be sure to install the correct EPROMs at the ODD and EVEN locations. The
instrument will not function if the EPROMs are installed in the wrong sockets.
5.
With the EPROM properly positioned, push down on the chip until it completely seats
into the chip carrier.
6.
Repeat steps 3 through 5 for EPROM U103.
7.
After installation, make sure the instrument powers up normally before replacing the
cover.
5-6
Disassembly
Summary of Contents for 2182
Page 10: ......
Page 14: ...1 Performance Verification Performance Verification...
Page 25: ...1 12 Performance Verification...
Page 26: ...2 Calibration Calibration...
Page 43: ...2 18 Calibration...
Page 44: ...3 Routine Maintenance RoutineMain tenance...
Page 47: ...3 4 Routine Maintenance...
Page 48: ...4 Troubleshooting Troubleshoot ing...
Page 64: ...5 Disassembly Disassembly...
Page 73: ...5 10 Disassembly...
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ...6 Replaceable Parts Replaceable Parts...
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ...A Specifications Specifica tions...
Page 96: ...B CalibrationReference Calibration Reference...
Page 109: ...B 14 Calibration Reference...
Page 110: ...C CalibrationProgram Calibration Program...
Page 115: ...C 6 Calibration Program...
Page 119: ......