
2
6
HYDRAULIC TUBING
Section 2.4 discusses the location of hydraulic tubing.
IMPORTANT:
All components and tubing must be kept absolutely clean to prevent dirt
from entering the system.
1. Determine tube locations and lengths.
Keep bends to a minimum. Make all bends with sweeping elbows to reduce heat
build up.
2. Cut tubes to length.
3. Position tubes.
Use rubber grommets or PVC tubes to protect the tubing when installing tubes
through cross-members. Installing the tubes underneath the side seal or cross-
members requires fastening with clamps.
25mm hoses can be used to connect the tubes to the drive unit.
4. Mount quick couplers at front of trailer.
Connect the male coupler on the pressure line (line to switching valve port
stamped "pump"). Connect the female coupler to the return line (line to switching
valve port stamped "res") (Figure 45). Apply hydraulic sealant.
5. Connect tubes to drive unit.
Connect the pressure line to switching valve port labeled "PUMP" and return line
to switching valve port labeled "RES". Make sure that rubber hoses are not
twisted.
Summary of Contents for Running Floor II Metric
Page 31: ...Figure 38 Figure 37 50mm...
Page 40: ...25044 Figure 45...