Table of Contents
7
Notes on this document.......................................................................................... 8
1.4.1
Contents of the document........................................................................ 8
Not contained in this document................................................................ 8
10
..........................................................................................
12
Operating elements and displays.......................................................................... 15
3.5.1
Keypad and LED assignment................................................................. 15
Status LED (operating panel back side)................................................. 17
Labeling strips for membrane keys........................................................ 17
Ordering information............................................................................................. 19
3.6.1
Ordering information legend................................................................... 19
Mounting and installation instructions
.........................................................................
21
Air conditioning, ventilation................................................................................... 23
4.6.1
.................................................................................................
24
Power supply operating panel (0V | 24V).............................................................. 24
5.2.1
Connection diagram............................................................................... 25
Cable specification................................................................................. 25
Operating panel
Table of Contents
© KEBA 2009
Project engineering manual V2.00
5
Summary of Contents for Kemro OP 350/C-1100
Page 4: ......